1

Underwater Protection

seulfswhhpv4
Given the characteristics of the flexible job-shop scheduling problem and the practical production of a given enterprise. a flexible job-shop scheduling model was proposed to minimize the maximum completion time. A novel algorithm was proposed to solve the model by integrating the dung beetle optimization algorithm and the simulated annealing algorithm. Algorithmic improvements includ... https://excellentphoto.shop/product-category/underwater-protection/
Report this page

Comments

    HTML is allowed

Who Upvoted this Story